Home  » References » Audit, scenario analysis and Optimisation

Technical and financial audit, scenario analysis and optimization

Project: Audit WWTP
Country: Belgium
Year: 2014

Project: Optimization WWTP Bazeilles
Country: Belgium
Year: 2014

Project: Optimization of on-line analysers and operation WWTP
Country: Belgium
Year: 2011- 2012

Project: Full survey process technology, maintenance and account management  WWTP
Country: Belgium
Year: 2011- 2012

Project: Feasibility study technical and financial optimization of WWTP's
Country: Netherlands
Year: 2010 - ongoing

Project: Simulations of flow rate WWTP 
Country: Netherlands
Year: 2010

Project: Technical and financial scenario analysis new water treatment
Country: Belgium (Namur)
Year: 2010

Project: Consultancy on process and optimization
Country: The Netherlands
Year: 2010

Project: Process support, optimization and analysis of samples
Country: Belgium
Year: 2010-2012

Project: Review on design of collector system 
Country: Belgium  (Namur) 
Year: 2009  

Project: Review on optimization WWTP Sharjah 
Country: UnitedArabEmirates   
Year: 2009  

Project: Audit operational company
Country: China (Kunshan)
Year: 2009

Project: Leasing a pilot sedimentation tank
Country: Belgium
Year: 2009

 

Project: Audit study final clarifier
Country: Belgium
Year: 2009

  

Project: Screening of the biogas installation
Country: Belgium
Capacity: 95 m/h
Year: 2009

 

Project: Second opinion on upgrading of membrane bioreactor
Country: Belgium
Capacity: 95 m/h
Year: 2009

Project: Optimization of pilot installation          
Country:Belgium 
Year: 2009

Project: Technical assistance for the evaluation of the environmental component of infrastructure investment projects (ISPA + Phare)
Partner: Ecolas (lead)
Country: ISPA countries and Croatia
Year: 2000-2003, 2004-2006

Project: EU Global Framework Contract for Services Lot nr 6 - Environment
Partner: Carl Bro
Country: Hongaria
Year: 2000-2002

 

Project: Scenario analysis pressure pipeline for connection to sewerage Country: Belgium
Capacity: 5,5 l/s
Year: 2008

 

Project: Audit of design and operation of biogas installation
Country: Belgium
Capacity: 60000 ton/year
Year: 2009

 

Project: Audit of permit dossier biogas installation
Country: Belgium
Year: 2009

 

Project: Scenario analysis for the optimization and renovation of the wastewater treatment plant  
Country: Belgium
Capacity: 34 m / h
Year: 2008

Project: Consultancy services for the unification of the water supply and sewerage councils in Nicosia, Lemesos, Larnaca
Partner: adk s.a. PWHC ITD Z&A
Country: Cyprus
Year: 2006-2007

   

Project: Sludge strategy study                        
Country: the Netherlands
Capacity: 2.100 tonnes dry matter/year
Year: 2008